Demolition for Managers and Professionals

Welcome to this free mock on Demolition for Managers and Professionals. We have created a set of questions on this subject to help you pass your CSCS Test for the Managers and Professionals card, and this subject is part of the core knowledge questions.

If you want to work on a construction site, then you will need to have a good understanding of this subject as you will be asked questions on them in the real exam.

In this mock test, we have provided the latest 19 questions you might be asked when sitting your real CSCS Test. In order to pass your managers and professionals test, you will need to score at least 46 out of 50 correct answers in 45 minutes.

There is no pass mark on this mini-test, so please keep using it until you know all of the questions from memory. Good Luck! Click here if you would like to site a full 50 question simulation Managers and Professionals mock test.

If you found this test helpful, let us know by leaving a comment.

Demolition for Managers and Professionals Questions

1. What should be obtained before safely carrying out the demolition cutting of fuel tanks?

Question 1 of 19

2. Which of the following does not ensure good health and safety standards on a demolition project?

Question 2 of 19

3. What do the letters SWL stand for?

Question 3 of 19

4. When asbestos material is suspected in buildings to be demolished, what is the first priority?

Question 4 of 19

5. Who must be the first person a demolition contractor appoints before undertaking demolition operations?

Question 5 of 19

6. Which of the following is true in relation to the safe working load of a piece of equipment?

Question 6 of 19

7. After exposure to lead, what precautions should you take before eating or drinking?

Question 7 of 19

8. What action should be taken if the contractor discovers unlabelled drums or containers on site?

Question 8 of 19

9. What should a contractor do if they discover underground services not previously identified?

Question 9 of 19

10. When do the Construction (Design and Management) Regulations 2015 require an excavation to be inspected by a competent person?

Question 10 of 19

11. Where would you find out the method for controlling identified hazards on a demolition project?

Question 11 of 19

12. Who should be consulted before demolition is carried out near to overhead cables?

Question 12 of 19

13. What should be clearly marked on all lifting accessories?

Question 13 of 19

14. Which two of the following documents refer to the specific hazards associated with demolition work in confined spaces?

Question 14 of 19

15. What safety feature is provided by FOPS on mobile plant?

Question 15 of 19

16. Which is the safest method of demolishing brick or internal walls by hand?

Question 16 of 19

17. If there are any doubts about a building’s stability, whom should a demolition contractor consult?

Question 17 of 19

18. What action should be taken by the contractor if a wire rope sling is defective?

Question 18 of 19

19. What is the most common source of high levels of lead in the atmosphere during demolition work of on old building?

Question 19 of 19


 

CSCSExam.com depends on the generosity of its readers. We love providing Free mock tests to you, but if you value what we do, please consider making a donation. It helps us keep the site running.





Why Not Try Out These Tests Next

Leave a Reply

Your email address will not be published.

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram