CSCS Mock Test For Managers and Professionals

Written By: Ryan - Admin
Updated on: March 6, 2023

Welcome to our Free CSCS Mock Test For Managers and Professionals. If you are working on a construction site in a managerial role, you will have to take this test to get hold of your card, for example, the CSCS Black Managers card and the Academically or Professionally Qualified person cards.

We have included a wide range of questions in this test, there are over 450 questions selected at random to provide you with a 50-question managers CSCS card mock test. So please take this a few times so you can view the different questions and answers.

The managers and professionals CSCS is the same length as the CSCS test for Operatives, it is 45 minutes long, but you will need to score at least 46 out of 50 to pass the exam. There is a larger bank of questions to revise and 3 extra categories to learn:

CSCS Mock Test for Managers and Professionals

If you want to work on a construction site and gain your black card, then you will need to have a good understanding of these questions as you will be asked questions on them in the real exam.

In this mock test, we have provided the latest 50 questions you might be asked when sitting your real CSCS Test. In order to pass your managers and professionals test, you will need to score at least 46 out of 50 correct answers in 45 minutes.

1. What is the correct procedure for using a tower crane to offload a lorry?
A.
B.
C.
D.
2. What must an employer do if an employee’s blood-lead level reaches the action level? Select two answers.
A.
B.
C.
D.
E.
3. Which of these does not have to be recorded in the accident book?
A.
B.
C.
D.
4. A foam extinguisher, identified by a cream band, should not be used on what type of fire?
A.
B.
C.
D.
5. Under the Construction (Design and Management) Regulations 2015, what must be recorded in writing before any demolition or dismantling begins?
A.
B.
C.
D.
6. What are yellow and black signs? W001 General Warning Sign
A.
B.
C.
D.
7. An excavator on site has overturned but no one was injured. What must have a next?
A.
B.
C.
D.
8. What do guard-rails around the top of an excavation prevent?
A.
B.
C.
D.
9. What additional training could be provided to supervisors and managers to help them spot the signs of mental illness?
A.
B.
C.
D.
10. Work is planned that requires the use of a power tool to cut or grind materials. Select the two best ways to control the dust.
A.
B.
C.
D.
E.
11. How should you be informed about emergency assembly points?
A.
B.
C.
D.
12. Breathing in dust whilst using a cutting disc to cut through concrete could result in which of the following diseases?
A.
B.
C.
D.
13. You are inspecting a site where there are overhead electric cables. What two arrangements should a contractor have in place to alert those on site to the presence of the cables?
A.
B.
C.
D.
E.
14. As part of a feasibility study you are planning an inspection of roof trusses inside a factory building. What is the recommended maximum height for a free-standing mobile tower when used indoors?
A.
B.
C.
D.
15. What illness might you develop if you breathe in dust and fumes over long periods of time?
A.
B.
C.
D.
16. Where must an emergency route or routes ensure safe access to?
A.
B.
C.
D.
17. How can you see for yourself that attention has been given to simple emergency procedures on site?
A.
B.
C.
D.
18. You are standing near a deep trench. A lorry backs up to the trench and the engine is left running. What should you do?
A.
B.
C.
D.
19. If there is an emergency while you are on site, what should you do first?
A.
B.
C.
D.
20. When should installed highways signs and guarding equipment be inspected?
A.
B.
C.
D.
21. How should workers find out what to do if they are injured on site?
A.
B.
C.
D.
22. Under the Construction (Design and Management) Regulations 2015, who is responsible for providing pre-construction information?
A.
B.
C.
D.
23. Place the five stages of a fire risk assessment in order
  • Periodically review
  • Identify the fire hazards
  • Evaluate the risks and plan
  • Identify the people at risk
  • Record plan and train
24. What must contractors ensure when work is taking place in a corridor that is a fire escape route?
A.
B.
C.
D.
25. A crane has to do a difficult lift. The signaller asks you to help, but you are not trained in recognised hand signals. What should you do?
A.
B.
C.
D.
26. What action should be taken if the contractor discovers unlabelled drums or containers on site?
A.
B.
C.
D.
27. What illness might a worker develop if they breathe in asbestos dust?
A.
B.
C.
D.
28. What does this sign mean? Fragile Roof
A.
B.
C.
D.
29. What should be your first action if you discover children playing on site?
A.
B.
C.
D.
30. If someone has fallen from height and has no feeling in their legs, what should you do?
A.
B.
C.
D.
31. If a single vehicle is carrying out mobile highway works during the day, what must be clearly displayed on or at the rear of the vehicle
A.
B.
C.
D.
32. How should workers be informed about what to do in an emergency? Give two answers.
A.
B.
C.
D.
E.
33. What does a risk assessment tell you?
A.
B.
C.
D.
34. What is the biggest cause of long-term health issues in the construction industry?
A.
B.
C.
D.
35. You have to use a new substance for the first time and need to carry out a COSHH assessment. What are the two main things you will need?
A.
B.
C.
D.
E.
36. What does this warning sign mean? W012 Warning Electricity
A.
B.
C.
D.
37. What is the minimum height of the main guard-rail on a scaffold?
A.
B.
C.
D.
38. What does this sign mean? E012 Safety Shower
A.
B.
C.
D.
39. What should all lifting equipment and accessories be?
A.
B.
C.
D.
40. Why is energy efficiency important?
A.
B.
C.
D.
41. What must a travelling first-aid kit not contain?
A.
B.
C.
D.
42. What is the recommended safe voltage for electrical equipment on building sites?
A.
B.
C.
D.
43. Where would you find out the method for controlling identified hazards on a demolition project?
A.
B.
C.
D.
44. Which one of the following signs would indicate the location of an automated external defibrillator (AED)?
A.
B.
C.
D.
45. When assessing the risk of land contamination what three areas need to be considered?
A.
B.
C.
D.
E.
46. What should you do if your workforce are lifting loads heavier than those recommended in the risk assessment?
A.
B.
C.
D.
47. When do the Construction (Design and Management) Regulations 2015 require a supported or battered excavation to be inspected?
A.
B.
C.
D.
48. How should acetylene and oxygen cylinders that are not in use be stored?
A.
B.
C.
D.
49. A forklift truck is blocking the way to where you want to go on site. It is lifting materials onto a scaffold. What should you do?
A.
B.
C.
D.
50. What is the purpose of an on site risk assessment?
A.
B.
C.
D.

 

Whats invloved in the CSCS Test for Managers (MAP)

The CSCS test for managers, also known as the Management and Professional (MAP) Test , is designed to assess an individual's knowledge and understanding of health and safety in the construction industry. The test covers a range of topics, including:

  • General health and safety principles
  • Risk assessment and control measures
  • Fire safety
  • Manual handling
  • Personal protective equipment
  • Working at heights
  • Electrical safety
  • Environmental protection
  • First aid
  • Welfare facilities and provisions
  • Health and safety law

The CSCS test for managers consists of 50 multiple-choice questions, and applicants must answer at least 47 of them correctly to pass the test. The test is taken online, and applicants have 45 minutes to complete it. A CSCS card will be issued to individuals who pass the test, which allows them to work as managers in the construction industry.

Click on a star to rate it!

Average rating 4.7 / 5. 144

No votes so far! Be the first to rate this post.

Why Not Try Out These Tests Next

Leave a Reply to Nick Harrison Cancel reply

Your email address will not be published. Required fields are marked *

64 comments on “CSCS Mock Test For Managers and Professionals”

  1. I checked with the official app. The answer to this question is wrong:
    Which two of these activities are likely to need a hot-work permit?

    The correct answer shouldn't include:
    "Refuelling a diesel dump truck"

    1. Hi Dyl

      Thanks for the heads up, you are completely right! Not sure how this got mixed up on the results, but thank you for letting us know. This has now been corrected

  2. Excellent mock test. It helped to emphasize the importance of reading the question

  3. Great help. I want to donate towards this useful service but won't use email banking. If there's any other way to contribute I will certainly.

  4. What a great site. Really helpful in letting you gauge your knowledge level. Especially nice is that you can see where you have gone wrong and learn from mistakes

  5. Shows the importance of reading the questions fully, before answering, and not rushing to finish.

  6. These mock test are a real help, when sitting the test, you are not made aware of why you got a question wrong this is most frustrating not to under stand your error.

  7. it is really helpful
    most of these question are in actual exam
    Thank you

  8. Very good, my revision was based on the 2016 CITB booklet and all the areas of the mock were covered within it. I advise anyone to obtain the latest version of the booklet before attempting this exam.

  9. Q28 28. A. Which of these statements about personal protective equipment (PPE) is not true?
    A. Workers must use it as instructed
    B. Workers must report any damage or loss to their manager
    C. Workers must store it correctly when they are not using it
    D. Workers must pay for any damage or loss
    I answered D and it says I got it wrong?

ConstructionExam.co.uk is not associated or part of any scheme
or organisation such as the CSCS, CPCS or CITB. The only intention of this website is to
provide information about these schemes and their assessments.
? linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram