CSCS Mock Test For Managers and Professionals

Written By: Ryan - Admin
Updated on: March 6, 2023

Welcome to our Free CSCS Mock Test For Managers and Professionals. If you are working on a construction site in a managerial role, you will have to take this test to get hold of your card, for example, the CSCS Black Managers card and the Academically or Professionally Qualified person cards.

We have included a wide range of questions in this test, there are over 450 questions selected at random to provide you with a 50-question managers CSCS card mock test. So please take this a few times so you can view the different questions and answers.

The managers and professionals CSCS is the same length as the CSCS test for Operatives, it is 45 minutes long, but you will need to score at least 46 out of 50 to pass the exam. There is a larger bank of questions to revise and 3 extra categories to learn:

CSCS Mock Test for Managers and Professionals

If you want to work on a construction site and gain your black card, then you will need to have a good understanding of these questions as you will be asked questions on them in the real exam.

In this mock test, we have provided the latest 50 questions you might be asked when sitting your real CSCS Test. In order to pass your managers and professionals test, you will need to score at least 46 out of 50 correct answers in 45 minutes.

1. A member of the public has been injured by work activities and taken to hospital for treatment. What should happen next?
A.
B.
C.
D.
2. How should you be informed about emergency assembly points?
A.
B.
C.
D.
3. An excavator on site has overturned but no one was injured. What must have a next?
A.
B.
C.
D.
4. Which of the following is not an immediate health effect of being exposed to paints and resins which have high levels of solvents?
A.
B.
C.
D.
5. What can cause occupational asthma?
A.
B.
C.
D.
6. What do guard-rails around the top of an excavation prevent?
A.
B.
C.
D.
7. Under the Construction (Design and Management) Regulations 2015, how long must you keep inspection records?
A.
B.
C.
D.
8. If someone is injured at work, who should record it in the accident book?
A.
B.
C.
D.
9. What should a contractor do if they discover underground services not previously identified?
A.
B.
C.
D.
10. Which checks should the operator of a mobile elevating work platform (MEWP) (for example, a cherry picker) carry out before using it?
A.
B.
C.
D.
11. If someone is wearing a harness and fall-arrest lanyard while working at height, what else must be done?
A.
B.
C.
D.
12. What is the recommended safe voltage for electrical equipment on building sites?
A.
B.
C.
D.
13. Which two of the following factors must be considered when providing first-aid facilities on site?
A.
B.
C.
D.
E.
14. If someone working in a deep inspection chamber has collapsed, what should you do first?
A.
B.
C.
D.
15. What should be obtained before safely carrying out the demolition cutting of fuel tanks?
A.
B.
C.
D.
16. Where are workers likely to breathe in the highest quantities of dust when drilling, cutting, sanding or grinding?
A.
B.
C.
D.
17. What sort of rest area should be provided for workers on site?
A.
B.
C.
D.
18. When is it most appropriate to use a safety harness and lanyard for working at height?
A.
B.
C.
D.
19. What should the capacity of a spillage bund around a fuel storage tank be, in addition to the volume of the tank?
A.
B.
C.
D.
20. When do the Construction (Design and Management) Regulations 2015 require an excavation to be inspected by a competent person?
A.
B.
C.
D.
21. A worker needs to carry out a task that involves manual handling of survey equipment in and out of vehicles. An old injury means that the worker has a weak back. What should you do?
A.
B.
C.
D.
22. A forklift truck is blocking the way to where you want to go on site. It is lifting materials onto a scaffold. What should you do?
A.
B.
C.
D.
23. Under the Construction (Design and Management) Regulations 2015, who is responsible for notifying the relevant enforcing authority when a project is notifiable?
A.
B.
C.
D.
24. Under the Construction (Design and Management) Regulations 2015, who must plan, manage and monitor health and safety during the construction phase on projects with more than one contractor?
A.
B.
C.
D.
25. If there are any doubts about a building’s stability, whom should a demolition contractor consult?
A.
B.
C.
D.
26. Which of the following does not ensure good health and safety standards on a demolition project?
A.
B.
C.
D.
27. What two things can be done to reduce trips and injuries caused by untidy leads and extension cables?
A.
B.
C.
D.
E.
28. Who should undertake a plan task that involves significant risk?
A.
B.
C.
D.
29. When should an automated external defibrillator (AED) be used?
A.
B.
C.
D.
30. What must contractors ensure when work is taking place in a corridor that is a fire escape route?
A.
B.
C.
D.
31. Under the Construction (Design and Management) Regulations 2015, what is not a duty of the principal contractor when consulting and engaging with workers?
A.
B.
C.
D.
32. The future use or energy performance of a building or structure can be affected if it is not built correctly. You notice a detail can’t be built as it has been designed. What should you do?
A.
B.
C.
D.
33. How can you tell if a product is hazardous?
A.
B.
C.
D.
34. What item of personal protective equipment (PPE), from the following list, should be used when oxyacetylene welding?
A.
B.
C.
D.
35. What guidance should you give a worker who needs to use a power tool with a rotating blade?
A.
B.
C.
D.
36. A worker is using a generator to power some lighting when the lamp (light bulb) blows. They have a spare lamp. What should they do?
A.
B.
C.
D.
37. Under the Construction (Design and Management) Regulations 2015, what must contractors provide to all workers under their control?
A.
B.
C.
D.
38. Under the Construction (Design and Management) Regulations 2015, when must the principal contractor make arrangements for drawing up a construction phase plan?
A.
B.
C.
D.
39. What colour should a 110 volt power cable and connector be?
A.
B.
C.
D.
40. When is a site vehicle most likely to injure pedestrians?
A.
B.
C.
D.
41. When should eye protection be worn?
A.
B.
C.
D.
42. Which of the following is true in relation to the safe working load of lifting equipment, such as a cherry picker, lorry loader or excavator?
A.
B.
C.
D.
43. When an employer’s first aid needs assessment indicates that a first aider is unnecessary, the minimum requirement is to ensure that there is an appointed person. Which of the following should an appointed person carry out?
A.
B.
C.
D.
44. How should workers find out what to do if they are injured on site?
A.
B.
C.
D.
45. In the context of a risk assessment, what does the term risk mean?
A.
B.
C.
D.
46. What is the maximum unprotected gap allowed between any guard-rail, toe board, barrier or other similar means of protection on a scaffold?
A.
B.
C.
D.
47. What illness might you develop if you breathe in dust and fumes over long periods of time?
A.
B.
C.
D.
48. Why might a brownfield site be affected by contaminated land? Select two answers.
A.
B.
C.
D.
E.
49. If employees have to work outdoors in bad weather, why should you supply them with waterproof clothing?
A.
B.
C.
D.
50. Why is it important to be clean shaven if using a half-mask respirator?
A.
B.
C.
D.

 

Whats invloved in the CSCS Test for Managers (MAP)

The CSCS test for managers, also known as the Management and Professional (MAP) Test , is designed to assess an individual's knowledge and understanding of health and safety in the construction industry. The test covers a range of topics, including:

  • General health and safety principles
  • Risk assessment and control measures
  • Fire safety
  • Manual handling
  • Personal protective equipment
  • Working at heights
  • Electrical safety
  • Environmental protection
  • First aid
  • Welfare facilities and provisions
  • Health and safety law

The CSCS test for managers consists of 50 multiple-choice questions, and applicants must answer at least 47 of them correctly to pass the test. The test is taken online, and applicants have 45 minutes to complete it. A CSCS card will be issued to individuals who pass the test, which allows them to work as managers in the construction industry.

Click on a star to rate it!

Average rating 4.7 / 5. 146

No votes so far! Be the first to rate this post.

Why Not Try Out These Tests Next

Leave a Reply to Ryan Cancel reply

Your email address will not be published. Required fields are marked *

64 comments on “CSCS Mock Test For Managers and Professionals”

  1. I checked with the official app. The answer to this question is wrong:
    Which two of these activities are likely to need a hot-work permit?

    The correct answer shouldn't include:
    "Refuelling a diesel dump truck"

    1. Hi Dyl

      Thanks for the heads up, you are completely right! Not sure how this got mixed up on the results, but thank you for letting us know. This has now been corrected

  2. Excellent mock test. It helped to emphasize the importance of reading the question

  3. Great help. I want to donate towards this useful service but won't use email banking. If there's any other way to contribute I will certainly.

  4. What a great site. Really helpful in letting you gauge your knowledge level. Especially nice is that you can see where you have gone wrong and learn from mistakes

  5. Shows the importance of reading the questions fully, before answering, and not rushing to finish.

  6. These mock test are a real help, when sitting the test, you are not made aware of why you got a question wrong this is most frustrating not to under stand your error.

  7. it is really helpful
    most of these question are in actual exam
    Thank you

  8. Very good, my revision was based on the 2016 CITB booklet and all the areas of the mock were covered within it. I advise anyone to obtain the latest version of the booklet before attempting this exam.

  9. Q28 28. A. Which of these statements about personal protective equipment (PPE) is not true?
    A. Workers must use it as instructed
    B. Workers must report any damage or loss to their manager
    C. Workers must store it correctly when they are not using it
    D. Workers must pay for any damage or loss
    I answered D and it says I got it wrong?

ConstructionExam.co.uk is not associated or part of any scheme
or organisation such as the CSCS, CPCS or CITB. The only intention of this website is to
provide information about these schemes and their assessments.